top of page
Search

Weep Hole Requirements in Australia: Getting Them Right the First Time

3 hours ago
4 min read
WeepEase weep hole tools held against face brickwork

That gap in the bottom of a brick wall isn't a mistake. It's a weep hole, and it has one of the most important jobs in the wall.

What is a weep hole?

Brickwork lets a little water through. That's normal. A weep hole is an open perp joint that lets that water drain back out of the cavity instead of sitting behind the bricks. Weepa has a good explainer on the importance of weep holes.

What the NCC says

The NCC Housing Provisions, Part 5.7.5 sets out the basics for weep holes:

Requirement

What it says

Where

The course immediately above any flashing, including a damp-proof course acting as a flashing

Height

At least 50 mm, by the width of the vertical mortar joint

Spacing

No more than 1.2 m centres

Exception

Not required where head openings are less than 1.2 m wide, beneath window and door sills, or where the outside surface is raised to give step-free access

Plans and engineers can specify more, and some states have their own requirements, so always check the project documents. Think Brick Australia is a good source of technical guidance on brickwork.

What's changed: NCC 2025 means more weep holes

NCC 2025 brings in a big change for brick walls. In climate zones 6, 7 and 8, external walls, including brick veneer and cavity brick, need a drained and ventilated cavity under ABCB Housing Provisions 10.8.1. The cavity needs openings with a free area of at least 1,000 mm² per metre of wall, at the base and the top of the cavity, or at each storey where the cavity is closed. Single skin masonry is exempt.

On the wall, that means more weep holes. A fully open perp on a standard brick, with the bed joints above and below left clear, gives about 960 mm². To reach 1,000 mm² per metre, that is a weep hole at every fourth perp, not just every 1.2 m. Fit a Weepa or vent with a smaller opening, like a 76 x 10 mm screen, and it drops to every third perp. The top of the cavity needs openings too: more weep holes, a continuous gap of at least 5 mm above the top course, or in zones 6 to 8, ventilation into a ventilated roof space.

Weepa’s NCC 2025 brick ventilation factsheet and Bricklayer Contractors Australia’s guide to ventilated masonry cavities walk through the numbers.

When it applies. Each state adopts the NCC on its own timeline, according to the ABCB adoption table:

State or territory

NCC 2025 applies from

Victoria

1 May 2026

ACT

1 May 2026 (12-month transition)

Western Australia

1 May 2026 (12-month transition)

New South Wales

1 May 2027 (NSW has its own Part 10.8 variation)

Queensland

1 May 2027

South Australia

1 May 2027 for houses (BCA)

Tasmania

1 May 2027 (Tasmania has its own Part 10.8 variation)

Northern Territory

Not adopted

Climate zone, wall type and your state all change what applies, so check the plans and talk to your building surveyor before you set out the first course.

More weep holes also means more chances for one to get a mortar dropping in it, and every one has to be clean and open to count. That is exactly the job WeepEase™ was made for.

Tips from Think Brick Australia

Think Brick Australia, the industry body that promotes building with clay brick and pavers, ran through weep holes and cavities at a recent industry session. A few points worth knowing before the first course goes down:

  • Check whether the weep holes at the base of your windows add to the open area along that wall. It can change how many extra weep holes the rest of the wall needs.

  • The damp-proof course, or a flashing acting as one, should be 20 mm wider than the brick leaf. It can be cut back or turned down once the wall is finished.

  • Render should never bridge the DPC. The DPC needs to run through the render and stay visible on the face of the wall.

Think Brick's Weepholes, NCC 2025 Ventilation and Flashings and DPCs fact sheets go into the detail. Building Commission NSW also has an advisory note on DPCs and flashings, put together with help from Think Brick, showing what its inspectors check on a standard brick veneer wall.

Open or covered? Weepa's, vents and bushfire zones

Not every weep hole gets covered. It depends on where the build is, its rating and what the plans or engineer specify. Some weep holes are left open. Others are finished with a Weepa or a vent like Weepguard, which keeps vermin out while still letting air and water through. In bushfire-prone areas, weep holes also need protection from embers, and Weepa makes a bushfire weep hole vent for exactly that. Whichever way it goes, the hole underneath still has to be clean, open and the right size.

What inspectors look for

A weep hole only works if it's open. At inspection, the hole needs to be clean, the right size and in the right spot, with no mortar bridging it or dropped on the flashing behind it. If a Weepa or vent is specified, it has to fit properly.

The easy way to get it right: WeepEase™

DAT Tools made WeepEase™ for exactly this. It goes in as you lay, comes out when the mortar is almost dry, and leaves a clean, open, consistent weep hole every time. The inspector sees a compliant hole, ready to leave open or finish with a Weepa if the plans call for one.

WeepEase tools forming clean, consistent weep holes in a stack bond brick wall

It was developed by Damian Amuso, a bricklayer with more than 27 years on the tools, after running several crews at DA Bricklaying and seeing a gap in the market for a tool made for this step. Watch the WeepEase™ how-to video.

Every Australian order from the DAT Tools online store comes with a free WeepEase™ sample.

Tools for brickies, by brickies.

Comments


bottom of page